Built with an adjacent parking garage, this 83,000 SF MOB includes a gastroenterology and veterans medical clinic.
This 4-story MOB was specifically constructed to provide clinic and office space related to the adjacent St. Vincent Medical Center. The building is highlighted by a 3-story glass curtain-wall entry with a covered walkway between the MOB and its connected parking structure. Brick and architectural metal panels wrap the steel-framed structure. The building includes an energy efficient mechanical system and electronic lighting control system. After completing the MOB, tenant buildout was completed for West Hill Gastroenterology, a 28,322 SF, one floor space that includes six (6)surgery/procedure rooms, pre/post-operation areas, nurse stations and medical exam and offices. Another floor is home to the 22,000 SF Veterans Medical Clinic.